Day 41 of FRC 2013 Build
February 15, 2013
Friday
The climbing system is fully integrated with the robot's superstructure. The air tanks for the pneumatics have been installed.
Troubleshooting for the robot's shooter-hopper is continuing. There are still some issues to resolve with the pneumatic wheels and the feeder mechanism.
The electrical team is dressing the wires and eliminating any chances of entanglement with the wires.

No comments:
Post a Comment