Powered By Blogger

Monday, January 7, 2013

Day 2

Day 2
Monday
January 7, 2013

The team completed all of it's objectives for day 2.


At the beginning of the meeting, students presented their strategies for the FRC 2013 game to the whole class. Following the presentations, the team divided into 4 design groups, with each group concentrating on creating 4 basic design concepts, with 1-2 of those concepts becoming preliminary design concepts.



The team is on track to select the final design by Saturday with construction of the robot to begin on Wednesday at the latest.

Only 43 more days until the Stop-Build day for the robot.

No comments:

Post a Comment